Quarantine Facility


    THE FACILITY - before renovation:

  • 1,700 cages mouse facility
  • 100% traditional IVC racks
  • 4.5 total FTE including technicians, washroom and driver
  • $550K per year operating costs

    THE PROBLEM:

  • Aging, failing sterilizer and boiler
  • Concerns that water temperatures were not always reaching minimum levels
  • Facing the risk of a failure and cease of operations

RENOVATING OPTIONS:

OPTION 1: Traditional IVC OPTION 2: Innovive Disposable IVC
RENOVATE the washroom:
~ Design and construction
~ Washing and sterilizing equipment
DECOMISSION the washroom
IVC Housing Option 1: continue
using existing traditional IVC racks
IVC Housing Option 2: invest in new Innovive IVC racks and caging
ESTIMATED COST - traditional:
$600K up-front investment
550K/year to operate
$3.35 M over 5 years
ESTIMATED COST - Innovive:
$150K up-front investment
$400K/year to operate
$2.15 M over 5 years

THE DECISION: Innovive Disposable IVC

After decommissioning the washroom facility, the customer completed 100% conversion to Innovive Disposable IVC Systems.
THE WATERING SOLUTION: prefilled Aquavive® water bottle. Soiled plastics being recycled by campus recyclers.


    AFTER RENOVATION -The Result:

  • 50% increase in cage capacity;
  • 40% headcount reduction;
  • $150,000 per year REDUCTION in operating costs;
  • 14 day cage change interval standard.