Quarantine Facility
- 1,700 cages mouse facility
- 100% traditional IVC racks
- 4.5 total FTE including technicians, washroom and driver
- $550K per year operating costs
THE FACILITY - before renovation:
- Aging, failing sterilizer and boiler
- Concerns that water temperatures were not always reaching minimum levels
- Facing the risk of a failure and cease of operations
THE PROBLEM:
RENOVATING OPTIONS:
| OPTION 1: Traditional IVC | OPTION 2: Innovive Disposable IVC |
| RENOVATE the washroom: ~ Design and construction ~ Washing and sterilizing equipment |
DECOMISSION the washroom |
| IVC Housing Option 1: continue using existing traditional IVC racks |
IVC Housing Option 2: invest in new Innovive IVC racks and caging |
| ESTIMATED COST - traditional: $600K up-front investment 550K/year to operate $3.35 M over 5 years |
ESTIMATED COST - Innovive: $150K up-front investment $400K/year to operate $2.15 M over 5 years |
THE DECISION: Innovive Disposable IVC
After decommissioning the washroom facility, the customer completed 100% conversion to Innovive Disposable IVC Systems.
THE WATERING SOLUTION: prefilled Aquavive® water bottle. Soiled plastics being recycled by campus recyclers.
- 50% increase in cage capacity;
- 40% headcount reduction;
- $150,000 per year REDUCTION in operating costs;
- 14 day cage change interval standard.